南通市通州区体育中心
羽毛球馆、游泳馆
钢 网 架
施 工
方
案
钢 网 架
施 工
方
案
2013年1月20日
| 目 | 录.....................................................................................................1 |
|---|---|
| 1、 | 编制依据.................................................................................................5 |
| 1.1 工程相关文件................................................................................5 | |
| 1.2主要施工规程、规范......................................................................5 | |
| 1.3主要标准..........................................................................................6 | |
| 1.4主要法规..........................................................................................6 | |
| 2、 | 工程概况.................................................................................................7 |
| 2.1工程简介..........................................................................................7 | |
| 2.2主要工程重点及难点....................................................................11 | |
| 3、 | 施工部署...............................................................................................11 |
| 3.1项目管理目标................................................................................11 | |
| 3.1.1工期目标.............................................................................11 | |
| 3.1.2质量目标.............................................................................11 | |
| 3.1.3安全目标.............................................................................11 | |
| 3.1.4文明施工目标.....................................................................11 | |
| 3.2项目机构配备情况........................................................................11 | |
| 3.3施工任务的划分............................................................................13 | |
| 3.3.1材料订购.............................................................................13 | |
| 3.3.2构件的运输.........................................................................13 |
| 3.3.3构件的安装.........................................................................13 |
|---|
| 3.4组织协调........................................................................................13 |
| 3.5施工部署总体顺序........................................................................13 |
| 3.5.1总体安装顺序.....................................................................13 |
| 3.5.2 主要施工方法概述...........................................................14 |
| 3.6施工进度安排................................................................................14 |
| 3.7主要项目工程量............................................................................18 |
| 3.8工程使用的大型设备情况............................................................18 |
| 3.9施工力量的安排............................................................................18 |
| 4、施工准备工作.......................................................................................18 |
| 4.1技术准备........................................................................................18 |
|---|
| 4.1.1施工详图的设计.................................................................18 |
| 4.1.2技术交底准备工作.............................................................18 |
| 4.1.2搞好钢结构安装前的施工现场测量工作.........................18 |
| 4.1.3需要做好的其他工作.........................................................19 |
| 4.2生产准备........................................................................................19 |
| 4.2.1现场安装主要设备.............................................................19 |
| 4.2.2测量所需主要仪器设备.....................................................19 |
| 4.3现场准备........................................................................................19 |
| 4.3.1 施工场地及机械准备.......................................................19 |
| 4.3.2人员准备.............................................................................20 |
| 5、钢构件运输...........................................................................................22 |
| 5.1运输准备........................................................................................22 |
| 5.2装卸车和构件现场堆放................................................................22 |
| 5.3运输过程中的注意事项................................................................22 |
| 6、现场主要施工方法...............................................................................23 |
| 6.1网架的施工部署............................................................................23 |
| 6.2网架拼装工程................................................................................23 |
| 6.2.1网架的组拼焊接顺序.........................................................23 |
| 6.2.2网架地面拼装与精度控制.................................................23 |
|---|
| 6.2.3拼装胎具搭建.....................................................................24 |
| 6.2.4网架拼装方法.....................................................................45 |
| 6.3现场焊接........................................................................................52 |
| 6.3.1焊接质量要求.....................................................................52 |
| 6.3.2本工程焊材选用.................................................................52 |
| 6.3.3球节点的焊接工艺.............................................................52 |
| 6.3.4焊接要求.............................................................................54 |
| 6.3.5焊接质量检查.....................................................................54 |
| 6.4 网架安装测量控制......................................................................54 |
| 6.4.1测量准备.............................................................................55 |
| 6.4.2控制网的布设.....................................................................56 |
|---|
| 6.4.3安装测量精度保障措施.....................................................57 |
| 6.4.4网架挠度测量方法及坐标控制.........................................58 |
| 6.4.5安装测量注意事项.............................................................58 |
| 7、主要施工管理措施...............................................................................59 |
| 7.1施工进度保证措施........................................................................59 |
| 7.1.1组织管理措施.....................................................................59 |
| 7.1.2技术措施.............................................................................60 |
| 7.1.3人力资源保障措施.............................................................61 |
| 7.2工程质量保证措施........................................................................61 |
| 7.2.1工程质量总目标.................................................................61 |
| 7.2.2质量保证体系.....................................................................62 |
| 7.2.3质量保证措施.....................................................................63 |
| 7.2.4成品保护措施.....................................................................63 |
| 7.3安全生产保证措施........................................................................64 |
| 7.3.1安全生产管理体系.............................................................64 |
| 7.3.2安全生产保证措施.............................................................64 |
| 7.3.3临时用电安全技术措施.....................................................66 |
| 7.3.4施工机具操作、防护安全措施.........................................67 |
| 7.3.5消防安全管理措施.............................................................68 | |
|---|---|
| 7.3.6安全事故应急预案.............................................................69 | |
| 附录1 | 施工现场平面图...........................................................................77 |
| 名 称 |
编 | 号 |
|---|---|---|
| 钢结构施工图纸 | ||
| 钢结构施工组织设计方案 |
| 类别 | 名 称 |
编号 |
|---|---|---|
| 设计 | 《建筑结构荷载规范》 | GB50009-2001 |
| 规范 | 《钢结构设计规范》 | GB50017-2003 |
| 《网架结构设计与施工规程》 | JGJ7-91 | |
| 《钢结构工程施工质量验收规范》 | GB50205-2001 | |
| 验收 | 《钢网架检验及验收标准》 | JG12-1999 |
| 规范 | 《建筑钢结构焊接与验收规程》 | JGJ81-2002 |
| 《网架结构工程质量检验评定标准》 | JGJ78-1991 | |
| 《碳素结构钢》 | GB/T700-1988 | |
| 材料 | 《热轧槽钢》 | GB/T707-1988 |
| 《热轧H型钢和部分T型钢》 | GB/T11263-1998 | |
| 《优质碳素结构钢》 | GB/T699-1999 | |
| 《结构用无缝钢管》 | GB/T8162-1999 | |
| 规范 | 《直缝电焊钢管》 | GB/T13793-93 |
| 《热轧钢板和钢带》 | GB/T709-1988 |
| 《优质碳素结构钢钢号及一般技术条件》 | GB/T 3077-88 | |
|---|---|---|
| 《碳钢焊条》 | GB5117-85 | |
| 安全 | 《建筑施工高处作业安全技术规范》 | GJG80-91 |
| 规范 | 《建筑施工安全检查标准》 | JGJ59-2011 |