村民安置项目 B-8 地块
装饰装修工程施工方案
编制: 审核: 时间: 2023.10
编制: 审核: 时间: 2023.10
| 第一章 | 工程概况....................................................................................................................................................4 |
|---|---|
| 1.1 | 编制依据..................................................................................................................................................4 |
| 1.2 | 工程概况..................................................................................................................................................4 |
| 1.2. | 1基本概况..................................................................................................................................................4 |
| 1.2. | 2建筑设计概况..........................................................................................................................................5 |
| 第二章 | 施工总部署................................................................................................................................................6 |
| 2.1 | 施工安排..................................................................................................................................................6 |
| 2.1.1 管理层负责人................................................................................................................................6 | |
| 2.1.2 工人数量及分工............................................................................................................................6 | |
| 2.1.3 施工机具准备................................................................................................................................6 | |
| 2.1.4 工期安排........................................................................................................................................6 | |
| 2.2 | 施工准备..................................................................................................................................................7 |
| 2.3 | 施工管理目标..........................................................................................................................................7 |
| 2.4 | 装饰装修做法说明..................................................................................................................................7 |
| 第三章 | 地面工程..................................................................................................................................................22 |
| 3.1 | 工艺流程................................................................................................................................................22 |
| 3.2 | 施工部署................................................................................................................................................22 |
| 3.3 | 地砖工艺方法及操作要点....................................................................................................................22 |
| 3.3.1 基层处理......................................................................................................................................22 | |
| 3.3.2 铺设防滑地砖..............................................................................................................................22 | |
| 3.3.3 调缝..............................................................................................................................................22 | |
| 3.3.4 擦缝..............................................................................................................................................23 | |
| 3.4 | 质量标准及要求....................................................................................................................................23 |
| 3.4.1 主控项目......................................................................................................................................23 | |
| 3.4.2 一般项目......................................................................................................................................23 | |
| 第四章 | 抹灰工程..................................................................................................................................................24 |
| 4.1 | 内墙抹灰................................................................................................................................................24 |
| 4.1.1 施工工艺流程..............................................................................................................................24 | |
| 4.1.2 基层处理......................................................................................................................................24 | |
| 4.1.3 贴灰饼、冲筋、做护角..............................................................................................................24 | |
| 4.1.4 抹底层灰......................................................................................................................................25 | |
| 4.1.5 修抹墙面上的箱、槽、孔洞......................................................................................................25 | |
| 4.1.6 抹面层砂浆..................................................................................................................................25 | |
| 4.1.7 石膏砂浆抹灰..............................................................................................................................25 | |
| 4.2 | 外墙抹灰................................................................................................................................................26 |
| 4.2.1 施工工艺流程..............................................................................................................................26 | |
| 4.2.2 吊垂直、套方、找规矩..............................................................................................................26 | |
| 4.2.3 抹底层灰、中层灰......................................................................................................................26 |
第 1 页共 46 页
| 4.2.4 弹线分格、嵌分格条..................................................................................................................26 | |
|---|---|
| 4.2.5 抹面层灰......................................................................................................................................27 | |
| 4.2.6 抹滴水线......................................................................................................................................27 | |
| 4.3 | 质量标准及要求....................................................................................................................................27 |
| 4.4 | 季节性保证措施....................................................................................................................................28 |
| 第五章 | 乳胶漆墙面及乳胶漆顶棚......................................................................................................................29 |
| 5.1 | 工艺流程................................................................................................................................................29 |
| 5.2 | 施工部署................................................................................................................................................29 |
| 5.3 | 工艺方法及操作要点............................................................................................................................29 |
| 5.4 | 质量标准及要求....................................................................................................................................29 |
| 5.4.1 主控项目....................................................................................................................................29 |
|
| 5.4.2 一般项目....................................................................................................................................30 |
|
| 5.4.3 应注意的质量问题....................................................................................................................30 |
|
| 5.4.4 成品保护....................................................................................................................................30 |
|
| 5.5 | 季节性保证措施......................................................................................................................................31 |
| 第六章 | 吊顶工程..................................................................................................................................................32 |
| 6.1 | 施工流程................................................................................................................................................32 |
| 6.2 | 主要施工方法........................................................................................................................................32 |
| 6.2.1 测量放线及吊杆安装..................................................................................................................32 | |
| 6.2.2 安装主龙骨..................................................................................................................................32 | |
| 6.2.3 安装次龙骨..................................................................................................................................32 | |
| 6.2.4 安装边龙骨..................................................................................................................................32 | |
| 6.2.5 安装“T”龙骨.................................................................................................................................32 | |
| 6.2.6 隐蔽检查......................................................................................................................................33 | |
| 6.2.7 校正调平......................................................................................................................................33 | |
| 6.2.8 安装面板......................................................................................................................................33 | |
| 6.3 | 质量控制标准........................................................................................................................................34 |
| 6.3.1 主控项目......................................................................................................................................34 | |
| 6.3.2 一般项目......................................................................................................................................34 | |
| 6.3.3允许偏差项目................................................................................................................................34 | |
| 6.4 | 质量保证措施........................................................................................................................................34 |
| 6.5 | 成品保护................................................................................................................................................36 |
| 第七章 | 防水工程..................................................................................................................................................37 |
| 7.1 | 工艺流程................................................................................................................................................37 |
| 7.2 | 施工部署................................................................................................................................................37 |
| 7.3 | 工艺方法及操作要点............................................................................................................................37 |
| 7.3.1 清理基层....................................................................................................................................37 |
|
| 7.3.2 配料............................................................................................................................................37 |
|
| 7.3.3 防水层施工................................................................................................................................37 |
|
| 7.3.4 防水保护层层施工....................................................................................................................37 |
第 2 页共 46 页
| 7.4 | 质量标准及要求....................................................................................................................................38 |
|---|---|
| 7.5 | 季节性保证措施....................................................................................................................................38 |
| 第八章 | 门窗安装工程............................................................................................................................................39 |
| 8.1 | 铝合金外窗的安装施工........................................................................................................................39 |
| 8.2 | 防火门安装施工....................................................................................................................................41 |
| 8.2.1 防火门安装施工工艺流程图.....................................................................................................41 |
|
| 8.2.2 施工方法及控制要点................................................................................................................41 |
|
| 8.2.3 施工注意事项............................................................................................................................42 |
|
| 8.3 | 木门安装................................................................................................................................................42 |
| 8.3.1 施工准备....................................................................................................................................42 |
|
| 8.3.2 施工工艺及方法........................................................................................................................42 |
|
| 8.3.3 成品保护....................................................................................................................................43 |
|
| 第九章 | 安全文明施工要求..................................................................................................................................44 |
| 第十章 | 绿色环保施工要求..................................................................................................................................46 |
| 10.1 | 基层处理方面......................................................................................................................................46 |
| 10.2 | 防水工程方面......................................................................................................................................46 |
| 10.3 | 墙地面砖方面......................................................................................................................................46 |
| 10.4 | 抹灰、涂料施工方面..........................................................................................................................46 |
第 3 页共 46 页
第一章 工程概况
| 序号 | 名 | 称 | 编 号 |
|---|---|---|---|
| 1 | 图 | 纸 | 本工程结构设计图纸、建筑设计图 |
| 2 | 施工组 | 织设计 | 施工组织设计 |
| 《建筑装饰装修工程质量验收规范》GB50210-2018 | |||
| 《住宅室内装饰装修工程质量验收规范》JGJ/T304-2013 | |||
| 《住宅装饰装修工程施工规范》GB50327-2001 | |||
| 《建筑地面工程施工质量验收规范》GB50209-2010 | |||
| 《住宅室内防水工程技术规范》JGJ298-2013 | |||
| 《施工现场临时用电安全技术规范》JGJ46-2005 | |||
| 规 | 程 | 《建筑工程施工质量验收统一标准》GB50300-2013 | |
| 规 | 范 | 《建筑砂浆基本性能试验方法标准》JGJ/T70-2009 | |
| 3 | 标 | 准 | 《安全防范工程技术规范》GB50348—2018 |
| 法 | 规 | 《建筑施工安全检查标准》JGJ59-2011 | |
| 《建筑施工高处作业安全技术规范》JGJ80-2016 | |||
| 《建筑施工工具式脚手架安全技术规程》JGJ202-2010 | |||
| 《民用建筑工程室内环境污染控制规范》GB50325—2023 | |||
| 《建筑用墙面涂料中有害物质限量》GB18582-2023 | |||
| 《室内装饰装修材料胶粘剂中有害物质限量》GB18583-2008 | |||
| 建筑施工手册(第五版) |
1.2 工程概况
| 1 | 项目名称 | 济南新旧动能转换先行区崔寨片区安置一区一期B-8地块 |
|---|---|---|
| 2 | 项目地点 | 本项目位于崔寨片区东北部,北至张仙寨路(王河路),南至 崔耿路(大青路),西至高道口村,东至簸萁刘沟东侧。 |
| 3 | 建设单位 | 济南新旧动能转换先行区崔寨街道办事处 |
| 4 | 总承包单位 | 中建八局第二建设有限公司 |
| 5 | 全询单位 |
第 4 页共 46 页
| 6 | 设计单位 | 中建八局第二建设有限公司 |
|---|---|---|
| 7 | 勘察单位 |
| 1 | 建设规模 | 总建筑面积为140246. 地下面积为44072.2㎡ 商业网点)、两栋配套 |
44㎡,其中地上面积为96174.24㎡, ;十六栋住宅(其中八栋楼底部为 商业、一座地下车库; |
|---|---|---|---|
| 2 | 使用功能 | 住宅、拟建配套商业、 | 配套公建、地下汽车库; |
| 3 | 建筑类别 | 住宅为二类高层建筑, | 公建为多层建筑; |
| 4 | 建筑耐火等级 | 地上为二级,地下为一 | 级; |
| 5 | 抗震设防烈度 | 7度; | |
| 6 | 设计使用年限 | 50年; | |
| 7 | 主要结构类型 | 剪力墙结构、框架结构 | ; |
| 8 | 户型 | 81、94、128、141 | |
| 9 | 装配式 | 建筑单体装配率:50% 预制叠合楼板(YDB) |
预制底板(60mm)+现浇叠合层 (70mm、100mm) |
| 预制梯段(YLT) | 构件厚度140mm,整体预制。 |
表 1.2-2 单体概况表
| 楼号 | 层数 | 建筑高度 (m) |
建筑面积 (㎡) |
地上建筑面 积(㎡) |
地下建筑面 积(㎡) |
|---|---|---|---|---|---|
| B8-1#楼 | 17/-2 | 50.10 | 10437.28 | 9400.8 | 1036.48 |
| B8-2#楼 | 15/-2 | 44.30 | 8915.29 | 7878.81 | 1036.48 |
| B8-3#楼 | 15/-2 | 44.30 | 8912.66 | 7874.51 | 1038.15 |
| B8-4#楼 | 17/-2 | 50.05 | 6627.52 | 5892.67 | 734.85 |
| B8-5#楼 | 16/-2 | 47.15 | 7181.47 | 6385.32 | 796.15 |
| B8-6#楼 | 16/-2 | 47.20 | 4711.06 | 4161.79 | 549.27 |
| B8-7#楼 | 16/-2 | 47.20 | 4713.07 | 4161.79 | 551.28 |
| B8-8#楼 | 16/-2 | 47.20 | 4737.63 | 4187.57 | 550.06 |
| B8-9#楼 | 16/-2 | 48.10 | 5994.57 | 5248.19 | 746.38 |
| B8-10#楼 | 16/-2 | 46.90 | 7352.49 | 6504.80 | 847.69 |
第 5 页共 46 页
| B8-11#楼 | 16/-2 | 46.90 | 7350.93 | 6504.80 | 846.13 |
|---|---|---|---|---|---|
| B8-12#楼 | 16/-2 | 47.15 | 7162.98 | 6362.05 | 800.93 |
| B8-13#楼 | 17/-2 | 50.05 | 6326.25 | 5591.40 | 734.85 |
| B8-14#楼 | 15/-2 | 44.25 | 5652.55 | 4908.22 | 744.33 |
| B8-15#楼 | 15/-2 | 44.25 | 5652.55 | 4908.22 | 744.33 |
| B8-16#楼 | 17/-2 | 50.05 | 6363.10 | 5618.77 | 744.33 |
| B8地块 地下车库 |
-1 | 地下3.6 | 31815.82 | 245.31 | 31570.51 |
| 岗位 | 姓名 | 职责 | |
|---|---|---|---|
| 项目经理 | 臧传龙 | 现场总指挥 | |
| 技术负责人 | 孙建斌 | 负责方案的编制、交底工作 | |
| 生产经理 | 屈 伟 |
现场副总指挥、全面协调组织现场施工 | |
| 总包管理层 | 安全总监 | 苗 强 |
负责施工过程中的安全监督工作 |
| 专业工程师 | 洪启文 | 具体负责B8地块施工安全、质量、进度等 管理工作。 |
|
| 质量总监 | 代海洋 | 负责工程的质量监督检查工作 |
| 工种 | 总数 | 分工 |
|---|---|---|
| 砼工 | 80人 | 浇筑楼层地面 |
| 抹灰工 | 200人 | 墙体抹灰 |
| 油漆工 | 80人 | 乳胶漆等墙体面层施工 |
| 防水工 | 50人 | 卫生间等涉水房间施工 |
第 6 页共 46 页
零工
30人 清理卫生 、 倒运材料
施工电梯 、 砂浆罐 、 小推车 、 机动斗式三轮车 、 铁抹子 、 压子 、 手持搅拌机 、 铁
铲 、 水平墨线仪 、 经纬仪 、 水准仪 、 钢卷尺 、 爬梯 、 门式架等 。
本工程各节点施工工期详见各阶段总 、 分工期计划 。
| 序号 | 楼号 | 开始时间 | 完成时间 | 备注 |
|---|---|---|---|---|
| 1 | 1#-8#楼 | 2023.10.10 | 2023.3.10 | / |
| 2 | 9#-16#楼 | 2023.10.20 | 2023.3.20 | / |
| 3 | 地下车库 | 2023.10.10 | 2023.3.10 | / |
2.2 施工准备
在每个分项工程施工前必须坚持技术先行的原则,对设计文件 、 图纸会审 、 变
更 、 洽商进行深入学习,了解设计意图,避免野蛮施工,进行合理的二次深化设计,做 好各工序的穿插,确保工程顺利进行,质量控制过程中坚持样板先行原则,大量施工
前先进行样板施工,明确施工工艺 、 装饰装修做法 、 施工材料等,样板验收后展开大
面积施工 。
本方案针对各单体工程的装饰装修施工进行施工部署 、 工艺流程 、 工序穿插 、 质
量标准 、 控制措施等进行设计编制 。
管理目标名称 目标值
第 7 页共 46 页
| 工 期 |
详见2.1.4工期安排 |
|---|---|
| 质量目标 | 合格 |
| 1、安全目标:符合职业健康安全管理体系要求及使用指南 | |
| 文明安全施工目 | GB/T45001-2023的要求,达到零死亡、零重伤、零火灾、零重大机 |
| 标 | 械设备事故,轻伤事故控制在3‰以下,职业病控制为零发病率; |
| 2、文明施工实施现场标准化管理,实现“四节一保、绿色施工”。 | |
| 环保施工 | 做到现场环境保护零污染、零扬尘、零渗漏。 |
| 序 | 号 | 名称 | 降板 厚度 |
建筑做法 | 使用部位 |
|---|---|---|---|---|---|
| 地1 | 细石混凝 土地面 |
40 | 1、40厚C20细石混凝土,表面 撒1:1水泥砂子随打随抹光; 2、素水泥浆一道; 3、钢筋混凝土结构底板。 |
地下二层储藏室及 走道 |
|
| 地 面 01 |
地2 | 水泥砂浆 地面 |
40 | 1、20厚(用于前室、侯梯厅、 楼梯间地面时40厚)1:2水泥砂 浆抹平压光; 2、素水泥浆一道; 3、钢筋混凝土结构底板。 |
地下二层设备用 房、住宅前室、侯 梯厅、楼梯间地面 |
| 地3 | 水泥砂浆 地面 |
40 | 1、最薄处20厚1:2.5防水砂浆向 地漏找坡,抹面压光; 2、钢筋混凝土结构底板。 |
水暖井、电井 | |
| 地4 | 防滑地砖 地面 |
1、8-10厚防滑地面砖铺实拍平, 稀水泥浆擦缝; 2、20厚1:3干硬性水泥砂浆; 3、素水泥浆一道; |
首层建筑主体外门 廊 |
第 8 页共 46 页
| 4、60厚C15混凝土垫层; 5、150厚3:7灰土; 6、素土夯实。 |
|||||
|---|---|---|---|---|---|
| 地5 | 细石混凝 土防水地 面 |
1、40厚C20细石混凝土,找坡 坡向集水坑,表面撒1: 1水泥砂 子随打随抹光; 2、2.0厚JS防水涂料(聚合物 水泥涂料,选用工型) 3、最薄处20厚1:3水泥砂浆找 坡找平; 4、素水泥浆一道 5、钢筋混凝土结构(底)板 |
内庭院地面 | ||
| 地6 | 防静电地 板地面 |
1、300高防静电活动地板; 2、20厚1:2水泥砂浆找平,表面 涂刷地板漆; 3、聚氨酯防水层(二道); 4、素水泥浆一道(内掺建筑 胶); 5、60厚C15混凝土垫层; 6、150厚3:7灰土; 7、素士夯实。 |
消防控制室 | ||
| 楼 面 02 |
楼1 | 地砖楼面 | 100 | 1、8 泥浆擦缝 2、20厚1:3干硬性水泥砂桨 3、50厚C20厚细石混凝士,面 层下10mm 3@100 钢筋网,表面压入一道 耐碱网格布,撤1: 1水泥砂子随 打随抹光; 4、20厚挤塑板保温层 5、钢筋混凝土楼板 |
客际、卧室、书 房、餐厅(94㎡以 下户型面砖规格为 600X600mm, 94㎡及以上户型面 砖 规 格 为 800X800mm) |
| 楼2 | 防滑地砖 | 130 | 1、8-10厚地面砖铺实拍平,稀 | 住宅厨房、卫生 |
第 9 页共 46 页