ABSTRACT
With the progress of China'seconomicand social,andcivil engineering industryof booming development,manualhole diggingpilearewidelyusedbecauseofitsadvantages, suchas construction equipment is simple,no noiseandnovibration duringtheconstruction processand bearingstratumisfacilitateto inspect.SowecanseeitinPilefoundationin lligh—rise buildings,the stabilizing pilesof geologicaldisaster prevention,bridge Engineering withstand the vertical loads digging pile.Rectangle man-dug pile not only applies to mountainous hilly soil relatively hard and topography change larger area,can also be applied in the soft soil foundation.The wall protection of Rectangle man—dug pile as the supporting structure of the free surface after excavation,mainly under the wall of soil mass behind its lateral earth pressure,The relationship between the number of earth pressure and digging pile excavation depth hasn’t clear computing SO far,but safety and reliability of the wall protection is directly related to operating personnel safetyand digginghole pile’S quality.
Based on the existing interaction mechanism of the Rectangle man-dug pile and soil behind wall protection,focus on the changeruleofearth pressurebehindwall protection go alongwiththeexcavation depthvalue.Combinedwithpractical engineering,comparedtothe current designmethodof wall protection,inorderto designwall protectionthicknessbetter. So that provide a reference tothe designandconstructionofmanualhole digging pileinthe actual project.
The main research contents and results are:
(1)UsingANSYSbuildfinite elementmodel to simulatethe excavation process, analysisthe changeruleof earth pressurebehindwall protection go alongwiththeexcavation depthvalue.
Comparedthecalculatedresultswiththelocalstandardsof Chongqing’’Geologicaldisaster preventionengineeringdesignspecifications”DB5/5029—2004.
(2)ThroughfivecommonsoilundertheRectangle man-dugpileexcavationsimulation, Found the soil pressureonthewall protectionintheinitialstatewiththeincreaseof the depth
¨